Rosyth & Devonport (Submarines)
Rosyth Dockyard was used for the refit, repair and maintenance of operational nuclear submarines from the 1960s until 2003. As each submarine reached the end of its operational life, it was defueled and decommissioned onsite. Phase 1 of the decommissioning is the removal of low-level waste from the decommissioned submarines.
Its primary role now is the dismantling of decommissioned nuclear submarines. It is also the integration site for the Royal Navy's newest aircraft carriers.
Information is presented about wastes that existed at Rosyth & Devonport (Submarines) at the stock date (1 April 2025) and were forecast to arise after this date.
For background information about this site owner, please refer to the Site Information Sheets in the 2025 UK Radioactive Waste Inventory report.
The following page presents information about radioactive wastes at the specific site selected.
Information about spent fuel and nuclear materials is presented separately in the relevant 2025 Inventory report. For official figures and essential information about how the data has been produced, always refer to the UKRWI 2025 published reports.
Waste groupings
stored
waste
arising
waste
packaged
waste
Waste categories
Showing results for data originating from Rosyth & Devonport (Submarines).
Display results by:
Forecast waste arisings
Location
Select a different site
From Amersham and AWE Aldermaston to Winfrith and Wylfa – you can source site-by-site waste inventory data from sites across the UK nuclear industry here.