2N03
- PCM Decommissioning Operations Drummed Secondary Waste
The waste at LLWR is from the decomissioning of PCM facilities, contaminated due to the storage of PCM. The waste at LLWR mainly originated from Sellafield, but significant amounts were from other UK nuclear installations e.g. Harwell and Aldermaston and was initially classified as PCM. However, a project was started to recategorise the drums following some initial investigations and to prevent long term storage and significant costs. ~1500 drums out of the ~1850 were found to be suitable for VLLW and these have been consigned to an approved Landfill facility since early 2024. The remaining drums are predominantly LLW and are undergoing assessment for appropriate waste routing.
Nuclear Waste Services (NWS) | LLW Repository | LLW