Hinkley Point A
Hinkley Point A is located on 19 hectares on the Somerset coast. Electricity generating concluded in 2000 following 35 years of operation.
The site is being decommissioned and is focussed on the safe and secure retrieval, packaging and storing of legacy waste. Priorities for the site include completing the build and commissioning of the intermediate level waste store and installing a waste treatment and encapsulation plant.
The site is in a unique position neighboured by an existing EDF AGR station as well as a new build EDF site.
Information is presented about wastes that existed at Hinkley Point A at the stock date (1 April 2025) and were forecast to arise after this date.
For background information about this site owner, please refer to the Site Information Sheets in the 2025 UK Radioactive Waste Inventory report.
The following page presents information about radioactive wastes at the specific site selected.
Information about spent fuel and nuclear materials is presented separately in the relevant 2025 Inventory report. For official figures and essential information about how the data has been produced, always refer to the UKRWI 2025 published reports.
Waste groupings
stored
waste
arising
waste
packaged
waste
Waste categories
Showing results for data originating from Hinkley Point A.
Display results by:
Forecast waste arisings
Location
Select a different site
From Amersham and AWE Aldermaston to Winfrith and Wylfa – you can source site-by-site waste inventory data from sites across the UK nuclear industry here.