Document library

You can use the filters to show only results that match your interests

Showing 239 documents

2A308 - Final Dismantling & Site Clearance: Misc Metals & Materials (Reactor and Non-Reactor) LLW
A variety of materials from active plant dismantling.

Sellafield Ltd | Sellafield | LLW


197 KB

92 KB

2A309 - Final Dismantling & Site Clearance: Secondary LLW
Wastes arising from contamination control procedures during plant dismantling.

Sellafield Ltd | Sellafield | LLW


197 KB

92 KB

2A310 - Final Dismantling & Site Clearance: Graphite ILW
Moderator graphite from reactor dismantling.

Sellafield Ltd | Sellafield | ILW


198 KB

94 KB

2A311 - Final Dismantling & Site Clearance : Mild Steel (Reactor) ILW
Mild steel items from the reactor structure.

Sellafield Ltd | Sellafield | ILW


198 KB

96 KB

2A312 - Final Dismantling & Site Clearance : Stainless Steel (Reactor) ILW
Stainless steel items from reactor dismantling.

Sellafield Ltd | Sellafield | ILW


196 KB

94 KB

2A313 - Final Dismantling & Site Clearance : Miscellaneous Metal (Reactor) ILW
A variety of miscellaneous metallic wastes resulting from reactor dismantling.

Sellafield Ltd | Sellafield | ILW


196 KB

94 KB

2A910 - Care and Maintenance Preparation (Reactor LLW)
Waste from Calder Hall Reactor Areas including turbine halls and LLW from Non-active support buildings e.g. workshops.

Sellafield Ltd | Sellafield | LLW


201 KB

93 KB

2D02 - High Level Liquid Waste
Concentrated fission product solution from the first stage of primary separation in reprocessing plants. Concentrated washings from HALES POCO.

Sellafield Ltd | Sellafield | HLW


225 KB

96 KB

2D03 - Plutonium Contaminated Materials; Drums
PCM arising from reprocessing operations at Sellafield. The arisings also include secondary waste from product repackaging and minor quantites of residue disposal.

Sellafield Ltd | Sellafield | ILW


207 KB

95 KB

2D06 - Plutonium Contaminated Materials; Crates and Filters
PCM has arisen principally from Sellafield operations. Some crated waste transferred from the LLWR is known to originate from other UK nuclear facilities.

Sellafield Ltd | Sellafield | ILW


199 KB

92 KB